Wednesday, January 11, 2012

FINALLY WE HAVE AN INSTALLATION DATE

About 2 months since the roof was replaced and the anchor points installed, and 3 months since the solar panels arrived, we are set to start the install on January 19th.  The first item will be a transformer disconnect by APS for a new service entry cable and a new 400A Siemens PV main meter panel.  The expected outage is 4-8 hours and I have battery backup for internet and wi-fi so I will be able to work from home, or use 4G modem if ISP is not available.  I plan to drop a new cable coax wire into the trench if the electrician will let me before he covers up.  This is needed because the COX ISP cable I have is only an inch under the surface gravel (xeriscape) and has severe damage where I hit it when I was shoveling out dirt for the new walk-thru gate in the block fence.

Watch for new photos soon.